So I came to an almost embarrassing conclusion last night when walking through the master bed space. You can still see outlines on the floor where the original master bathroom sat, and well, it appears the footprint of our old master bathroom would fit entirely in the new shower alone. Holy smokes! Here you see the curb outline, corner seat, in-wall shelf, double controls on the wall. Next steps are the glass block walls, floor and wall tiling, and finish work. Up near the light you can see where the rain head will drop from the ceiling. Then there will be a hand wand above the controls.

The gang also put in the tub this week. I missed that....
darn, and apparently it was pretty humorous as it took 6 people to drop in that sucker in. Next steps are tiling the surround, and putting in the 3-Form Chroma cap on the tub surround. The 3-Form Chroma is a recyclable resin, that will also be the top for the vanity.
Ric has been a HUGE help in the whole project, team leader, cracking the whip, throwing out design ideas, and fabricating all the little details.
Porter is the master sheetrock and mud guy, he's been teaching Michelle a thing or two on sanding and putting up sheetrock, the guy rocks.
Oh, and we've put up a ton more photos on flickr showing the progress, the newest images are on the last few pages.
So now we are ready to start painting or at least priming the masterbedroom. good times ahead....